If 8 men can do a piece of work in 14 days, the time taken by 12 men to do the same piece of work will be:

  1. A.7.5 days
  2. B.8 days
  3. C.8.5 days
  4. D.9.33 days✓ Correct

Explanation

Using M1D1 = M2D2: 8×14 = 12×D2, so D2 = 112/12 = 9.33 days.