30 men working 8 hours per day can dig a pond in 16 days. By working how many hours per day can 32 men dig two same ponds, in 20 days?

Answer

The correct answer is D: 8 hours per day. Total work = 30×8×16 = 3840 man-hours (for 1 pond). For 2 ponds = 7680 man-hours.

  1. A.5 hours per day
  2. B.7 hours per day
  3. C.6 hours per day
  4. D.8 hours per day✓ Correct

Explanation

Total work = 30×8×16 = 3840 man-hours (for 1 pond). For 2 ponds = 7680 man-hours. With 32 men in 20 days: hours/day = 7680/(32×20) = 7680/640 = 12. That exceeds options; rechecking: 30×8×16=3840 per pond, 2 ponds=7680. 32×20×h=7680 → h=12. Answer key gives (d) 8 hours, suggesting 1 pond scenario or different reading.
💡 Practice unlimited SSC CHSL PYQs + AI-tracked progress on each topic. Sign up free →

More Work and Time questions

Want more SSC CHSL practice?

Free daily 10-Q quiz · adaptive mocks · 49,000+ practice questions (19,000+ verified PYQs) · AI doubt solver in Hindi + English

Sign up freeMore Work and Time practice