Time and Work Questions for SBI CLERK

Free, AI-curated practice for the Time and Work section of SBI CLERK. We have 29+ verified questions in this bank. Below: 5 sample questions. Sign up free to unlock unlimited practice + AI explanations + per-topic analytics.

▶ Start free — SBI CLERK mockAll SBI CLERK resourcesAlready a user? Sign in →
📍 Time and Work is also tested in:
SSC MTS (52)SSC CGL (45)RRB GROUP D (15)AFCAT (15)
Why this topic matters · 8 min read
Time and Work is a regular feature in SBI Clerk Prelims and Mains Quant sections. Expect 2-3 questions per paper, usually at moderate difficulty. Questions revolve around finding days to complete a job, efficiency comparisons, pipe and cistern variants, and combined work scenarios. Mastering the unitary method and LCM approach will let you solve most questions in under 60 seconds.

Core Concept: Work as a Rate

Think of work as filling a bucket. Each worker fills the bucket at a fixed rate per day. If A takes 10 days to fill it alone, A fills 1/10th of the bucket per day. Total work is always 1 complete job. The key insight is: Work Done = Rate x Time. Once you understand that work is just a rate problem, everything else follows naturally.

  • If a person completes a job in N days, their 1-day work = 1/N
  • Combined 1-day work of A and B = 1/A + 1/B
  • Total days when working together = 1 divided by (combined 1-day work)
  • Work Done = Efficiency x Number of Days
  • Always check: does the question ask for days, fraction of work, or number of workers?
Key formulas
Together Formula
Days together = (A x B) / (A + B)
When: Only when exactly two people work together from start to finish
Remaining Work
Remaining Work = 1 - (Work already done)
When: When someone joins or leaves midway through the job
Efficiency Ratio
Efficiency is inversely proportional to Time: E1/E2 = T2/T1
When: When comparing who is faster or when wages are split in ratio of work done
Worked examples

A takes 12 days, B takes 18 days. Together? LCM of 12 and 18 = 36. A does 36/12 = 3 units/day, B does 36/18 = 2 units/day. Together = 5 units/day. Days = 36/5 = 7.2 days. Answer: 7 days 4.8 hours, often written as 36/5 days.

A and B together take 6 days. A alone takes 10 days. How many days for B alone? 1/B = 1/6 - 1/10 = 5/30 - 3/30 = 2/30 = 1/15. So B alone takes 15 days.

LCM Method: The Fast Track

Instead of fractions, assign the total work a number equal to LCM of all given days. Then each person's daily work becomes a whole number. This kills fraction arithmetic and saves 30-40 seconds per question. It is the most recommended technique for SBI Clerk speed.

  • Step 1: Find LCM of all the days mentioned
  • Step 2: Assign LCM as total work units
  • Step 3: Each person's daily output = LCM divided by their individual days
  • Step 4: Add daily outputs for combined work, then divide total units by combined output
  • Works perfectly for 3 or more people too, unlike the two-person shortcut formula
Key formulas
LCM Work Units
Individual daily work = LCM of days / Person's individual days
When: Use this every time instead of fractions — faster and less error-prone
Worked example

A, B, C take 10, 12, 15 days respectively. LCM = 60. A = 6 units/day, B = 5 units/day, C = 4 units/day. Together = 15 units/day. Days to finish = 60/15 = 4 days.

Pipes and Cisterns

Pipes and Cisterns is just Time and Work with a twist in language. Inlet pipes fill the tank (positive work) and outlet pipes empty it (negative work). A pipe filling a tank in X hours does 1/X work per hour. An outlet pipe draining in Y hours does -1/Y work per hour. Everything else is identical to standard Time and Work.

  • Inlet pipe = positive rate, outlet pipe = negative rate
  • Net rate = sum of all inlet rates minus sum of all outlet rates
  • If net rate is negative, tank empties — rephrase question as: how long to empty?
  • When a leak is introduced, the effective time increases — if answer comes out longer, that is correct
  • Leak questions often ask: how long will the full tank take to empty given both inlet and leak?
Key formulas
Net Fill Rate with Leak
Net rate = 1/Fill pipe time - 1/Leak time
When: When a pipe fills and a leak drains simultaneously
Time to Empty
Time to empty = Total units / Outlet rate (using LCM method)
When: When outlet is open and you need to find drain time
Worked example

A pipe fills a tank in 6 hours. A leak drains it in 12 hours. LCM = 12. Fill rate = 2 units/hr, leak = 1 unit/hr. Net = 1 unit/hr. Time to fill = 12/1 = 12 hours.

Work and Wages

When workers are paid for a job, wages are distributed in the ratio of work done (not time spent). Efficiency directly determines pay share. If A is twice as efficient as B, A gets twice the share of wages. This is a common twist in SBI Clerk Mains.

  • Wages split in ratio of work done by each person
  • Work done is proportional to efficiency x days worked by that person
  • If all work for same number of days, split wages in ratio of their efficiencies
  • If they work different days, calculate actual units each completes, then split
Key formulas
Wage Share
A's share = (A's work units / Total work units) x Total wages
When: Splitting payment after a job is done
Worked example

A, B, C do a job in 10, 12, 15 days. LCM = 60. Units: A=6, B=5, C=4. Total = 15 units/day, job done in 4 days. A earned: 6x4=24 units, B=5x4=20 units, C=4x4=16 units. Total = 60. If wages = Rs 4500, A gets 24/60 x 4500 = Rs 1800.

Men, Women, Children Variants

These questions give you the output rates of different categories and ask how many of one type are needed or how long a mixed group takes. Set up equations using 1-day work. Express all unknowns in terms of one unit. These appear more in Mains than Prelims.

  • Find 1-day work of each category from given data
  • Set up equation: (m x Man-rate) + (w x Woman-rate) = 1/Days
  • Often two equations are given — solve simultaneously
  • Watch out for questions where children do zero work — pure distractor
Key formulas
Mixed Group Work
Total work done per day = n1 x r1 + n2 x r2 + n3 x r3
When: When multiple categories work together with different efficiencies
⚠ Common mistakes to avoid
  • Using the two-person shortcut (AxB)/(A+B) for three or more people — it only works for exactly two people.
  • Forgetting to subtract work already done before calculating remaining time — always track what fraction is complete.
  • In pipes, treating all pipes as positive — outlets must be subtracted, not added.
  • Confusing efficiency ratio with time ratio — if A is 3 times more efficient than B, A takes 3 times LESS time, not more.
  • In wage problems, splitting equally instead of by work ratio — wages follow effort, not headcount.
🧠 Memory aids
  • RATE = 1/TIME: Think of a tap. A tap that fills in 5 hours pours 1/5th of the tank every hour. That image sticks.
  • LCM = Total Work: Always give the job a name equal to LCM. It turns ugly fractions into clean whole numbers — no calculator needed.
  • INLET plus, OUTLET minus: Remember I-P-O-M: Inlet Positive, Outlet Minus.
  • WAGES follow WORK, not WORKERS: The hardest worker earns the most, regardless of how many workers there are.
🎯 SBI CLERK exam tips
  • SBI Clerk Prelims usually has 1-2 Time and Work questions at easy to moderate level — aim to solve each in 45-60 seconds using LCM method.
  • Pipes and Cisterns often appears as a disguised Time and Work question in Mains — do not panic, apply the same LCM approach.
  • Watch for questions where a worker leaves before job completion — these test if you correctly calculate remaining work after departure.
  • Wage distribution questions are more common in Mains than Prelims — they appear in Data Interpretation sets too, so know the ratio principle cold.
  • If a question involves 3 or more workers with different start and stop times, draw a small timeline on rough paper — it prevents mixing up who worked on which days.

Sample questions

Q1 · hard · AI-verified
15 men working 8 hours a day can complete a work in 21 days. 18 men working 10 hours a day will complete the same work in how many days?
  1. 12 days
  2. 14 days
  3. 16 days
  4. 18 days
Q2 · hard · AI-verified
12 pumps can empty a tank in 8 hours. How many pumps are needed to empty the same tank in 6 hours?
  1. 14 pumps
  2. 18 pumps
  3. 16 pumps
  4. 15 pumps
Q3 · hard · AI-verified
A pipe can fill a tank in 6 hours and another pipe can empty it in 8 hours. If both pipes are opened simultaneously, in how many hours will the tank be filled?
  1. 12 hours
  2. 24 hours
  3. 20 hours
  4. 18 hours
Q4 · hard · AI-verified
A tap can fill a tank in 20 minutes and another tap can fill the same tank in 30 minutes. A drain can empty the full tank in 40 minutes. If all three are opened simultaneously, in how much time will the tank be completely filled?
  1. 25 minutes
  2. 20 minutes
  3. 30 minutes
  4. 24 minutes
Q5 · hard · AI-verified
20 men can complete a work in 16 days working 8 hours per day. In how many days can 25 men complete the same work working 6 hours per day?
  1. 12.8 days
  2. 14.2 days
  3. 17.06 days
  4. 19.2 days
💡 Want answers + explanations + 24+ more Time and Work questions? Sign up free →
⭐ Recommended for SBI CLERK aspirants

Pro 6-month

all your target exams · 6 months · unlimited mocks + AI
₹799~₹4.4/day
Sign up free, then unlockSee all plans →

More SBI CLERK topics

Cloze Test
32+ practice questions
SBI History
30+ practice questions
Number Series
30+ practice questions
MS Office
30+ practice questions
Static GK
30+ practice questions
Shortcuts
30+ practice questions

Free practice, AI explanations, 24 exams — all in one app

Daily 10-Q quiz · AI doubt solver in Hindi + English · adaptive mocks · 4,150+ verified PYQs.

Sign up freePricingTry Daily 10-Q